The Port Hedland Salt Berth operated by the Pilbara Port Authority plays a vital role in the region’s infrastructure, enabling the export of minerals including salt.
During the construction of this berth, the project encountered a significant challenge: ensuring the long-term strength of the concrete used in high-temperature conditions.
To tackle this concern, they opted for AQURON 7000, a specialised concrete treatment solution designed to enhance durability.
Unlike a traditional sealer, AQURON 7000 is uniquely formulated to minimise cracks and guard against chloride-related deterioration.
By applying this product, the team was able to extend the lifespan of the salt berth, ensuring that it would continue to serve the needs of the local community for years to come.