MARKHAM Case Study – Panattoni Park

markham projects panattoni park 2

At Panattoni Park Avonmouth, innovation met efficiency. Faced with the challenges of traditional multi-coat deck membranes including weather delays and curing time, MARKHAM delivered a smarter solution for two multi-storey car parks.

MARKHAM hydrogel waterproofing system combined CONQOR B50 admixture, AQURON 2000 spray treatment, and CONQOR 47B waterstop gaskets, creating a fully integrated, long-life protection system. This approach allowed waterproofing to happen concurrently with the concrete pour, eliminating delays and ensuring durability without future maintenance.

The result? A robust, sustainable outcome that keeps exposed surfaces protected while meeting OHS standards with nil VOC products. Another example of how MARKHAM is adding life to concrete and helping projects stay on schedule, even in challenging conditions.

Learn more about our approach: download the free case study.

Scroll to Top