Adding Life to Concrete – How MARKHAM applied hydrogel waterproofing systems to a Ferry Terminal Jetty in Lochmaddy, North Uist, Outer Hebrides.
MARKHAM were tasked with providing a Lochmaddy Pier waterproofing and durability enhancement system for what is at least a 100-year-old concrete jetty structure in North Uist. This was part of an overall refurbishment programme on the concrete structure of the jetty serving the Ferry Terminal.
Download the free case study to learn the challenges and the results!